PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing safety poles around Derrick -7 (2nd Floor) Facing South-East (800x600).jpg Safety Poles around Derrick -7 (2nd Floor) Facing South-East (800x600).jpg Welding column at the Monumental Stairs Facing South (800x600).jpg Welding Derrick -5 (4th Floor) Facing North-East  (800x600).jpg Drilled holes at Elev. 5,6 for the rebar prepping for the slab on grade Facing West (800x600).jpg Graded site Facing South-West (800x600).jpg Installing Safety cables around Derrick -7 (2nd Floor) Facing South (800x600).jpg
Previous pageNext page Drilled holes at Elev. 5,6 for the rebar prepping for the slab on grade Facing West (800x600)
Drilled holes at Elev. 5,6 for the rebar prepping for the slab on grade Facing West (800x600)